During the last 2 weeks i was able to install the basic shell structure. I used a mitre saw from Metabo to cut all the wood. Please have a look at the pictures….
![The overhead panel finds its home in the upper part of the shell. It is held in place by 4 M8 screws.](http://lowtone.de/wordpress/wp-content/uploads/2013/05/2013-05-19-15.34.30-600x450.jpg)
The overhead panel finds its home in the upper part of the shell. It is held in place by 4 M8 screws.
![The shell structure has been closed temporarily with plywood and some cardbox. It is really a big difference now to sit inside the sim....](http://lowtone.de/wordpress/wp-content/uploads/2013/05/2013-05-19-21.12.11-600x450.jpg)
The shell structure has been closed temporarily with plywood and cardbox. It is really a big difference now to sit inside the sim….