Tag Archives: Painting

Rework of Poldragonet Overhead Panel

The Overhead Panel was purchased before Christmas and arrived 4 weeks later. I installed all switches, rotaries and fake gauges. When this was finished i realized that i might have a lot of gaps between the the switches and the holes. The first picture illustrates that problem. So i had to disassemble the complete hardware again and masked all switch holes. It took me 2 hours to disassemble and mask it.2 Hours waste time if i had done everything right the first time.

 

Gaps between the switches. Backlight shines though.

Gaps between the switches. Backlight shines though.

Disassembling the Front Panels again

Disassembling the Front Panels again

All holes have been masked and are ready for painting.

All holes have been masked and are ready for painting.